remove and install: Injection valves — VW Fox (5Z) (CNXA, CWSA)
Remove and install — Injection valves — VW Fox (5Z) (CNXA, CWSA). 25 source steps and 1 tables. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: VW Fox (5Z)
- Replacement notes from the steps (read the conditions below): Replace the sealing rings (7) of the injection valves (8). Replace the sealing rings (6) of the injection valves (7).
Don't miss
- Slightly lubricate the sealing rings (7) with clean engine oil before installing.
- Ensure proper seating of the sealing rings (7) in the injection valves (8).
- Ensure the proper fastening clamp (6) installation position.
- Ensure proper seating of injection valves (8) when installing on the injection valve seat (5).
- Slightly lubricate the sealing rings (6) with clean engine oil before installing.
📋 Procedure
- ⚠ Follow the instructions below to prevent severe injuries:With the ignition switched off, disconnect the earth wire from the BatteryAElectrical equipment 27 Starter, alternator, battery. Always disconnect the fuel rail supply on the engine compartment connection next to the A-pillar, rather than on the fuel rail. In vehicles equipped with the E-Flex cold start system, the fuel rail may be hot. — Remove air filter (see the separate procedure).
- Remove the Magnetic valve 1 for activated charcoal filter tank N80 hose (4).
- Disconnect the connectors (1) and (3) from the injection valves and glow plugs.
- Release the electric cables from supports (2) in the fuel rail, removing them from the area.
- ⚠ The fuel supply system is under pressure! Always wear protection gloves and glasses, so as to prevent serious injuries and contact with the skin. Before loosening the hose connections, wrap the connection points with a cloth. After depressurizing, carefully remove the connection. — Release the fuel intake line by carefully pressing hose connector (1) downwards; next, press the locks, moving the connector upwards and towards the Activated charcoal filter solenoid valve IN80(2) follow the same instructions.
- Open line clamps (3) and remove the pipes.
- Seal the lines with the Pipe sealing tool T10249, in order to prevent impurities from entering the supply system.
- ⚠ Follow the instructions below to prevent severe injuries:With the ignition switched off, disconnect the earth wire from the BatteryAElectrical equipment 27 Starter, alternator, battery. Always disconnect the fuel rail supply on the engine compartment connection next to the A-pillar, rather than on the fuel rail. With the E-Flex cold start system, the fuel rail may be hot. — Remove the fastening bolts (2) of the fuel rail (3) in the intake manifold.
- Remove the fuel rail (3) along with the injection valves (8) and the intake manifold glow plugs (4).
- Carefully remove the fastening clamp (6) from the injection valve (8).
- Remove the injection valve (8) of the fuel rail (3).
- Replace the sealing rings (7) of the injection valves (8).
- Slightly lubricate the sealing rings (7) with clean engine oil before installing.
- Ensure proper seating of the sealing rings (7) in the injection valves (8).
- Ensure the proper fastening clamp (6) installation position.
- Ensure proper seating of injection valves (8) when installing on the injection valve seat (5).
- ⚠ Follow the instructions below to prevent severe injuries:With the ignition switched off, disconnect the earth wire from the BatteryAElectrical equipment 27 Starter, alternator, battery. Always disconnect the fuel rail supply on the engine compartment connection next to the A-pillar, rather than on the fuel rail. — Remove the fastening bolts (2) of the fuel rail (3) in the intake manifold.
- Remove the fuel rail (3) along with the injection valves (7) of the intake manifold.
- Carefully remove the fastening clamp (5) from the injection valve (7).
- Remove the injection valve (7) of the fuel rail (3).
- Replace the sealing rings (6) of the injection valves (7).
- Slightly lubricate the sealing rings (6) with clean engine oil before installing.
- Ensure proper seating of the sealing rings (6) in the injection valves (7).
- Ensure the proper fastening clamp (5) installation position.
- Ensure proper seating of injection valves (7) when installing on the injection valve seat (4).
Other VW procedures
- Checking the Injection Valves – VW 2.3 AGL
- Checking vane pump delivery pressure, 6-cylinder injection engine, 5 valves
- Injection valves (CSEA engine) - remove and install
- Injection valves (CWRA engine) - remove and install
- Removing and installing power steering vane pump, 6-cylinder injection engine, 5 valves
- 4-cylinder 1.4 l fuel injection engine with basic belt drive
- Valve stem sealant (cylinder head installed) - replace
- Front exhaust pipe with catalytic converters in the cylinder head - installation sequence
- Installation
- Valve timing - check/adjust
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.