TorqFix

Timing belt replacement: Nissan CD20T

Timing belt replacement — Nissan CD20T. 34 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

34 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: coolant
  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Special tools named: locking tool
  • Replacement notes from the steps (read the conditions below): Check the tensioner and idler pulleys; renew if necessary

Don't miss

  • Always fit a new timing belt after removal
  • Never turn the engine in the direction opposite to that of normal operation
  • The engine must be cold before timing belt adjustment
  • Always check the timing marks before timing belt removal

🔧 Engine codes recorded for this source

📋 Procedure

Special tools

  • Locking tool

Warnings and recommendations

  1. Unless otherwise advised by the manufacturer, the following procedures are recommended:
  2. Always fit a new timing belt after removal
  3. Check the tensioner and idler pulleys; renew if necessary
  4. Never turn the engine in the direction opposite to that of normal operation
  5. Inspect the belt(s) for cracks, fraying, wear and oil contamination
  6. Note: The engine must be cold before timing belt adjustment
    The inspection and the replacement instruction serve different purposes. Check the belt, tensioner and idlers during preparation, but still fit a new timing belt after removal as this source requires. Carry out the adjustment with the engine cold.
  7. Note: Avoid bending, torsion or traction

General

  1. Always check the timing marks before timing belt removal

Removal

  1. Disconnect the battery
  2. Drain the coolant
  3. Remove the radiator upper hose
  4. Remove the timing belt upper cover
  5. Remove the coolant pump pulley
  6. Align the timing marks
  7. Remove the starter motor
  8. Fit the locking tool
  9. Remove the crankshaft pulley
  10. Remove the timing belt lower cover
  11. Loosen the tensioner
  12. Turn the tensioner anti-clockwise
  13. Tighten the tensioner
  14. Remove the camshaft cover
  15. Remove the timing belt and crankshaft gearwheel

Installation

  1. Check the timing marks
  2. Fit the idler pulley
  3. Fit the timing belt
  4. Align the timing marks
  5. Refit the cover
  6. Note: Use locking compound
  7. Loosen the tensioner to tension the timing belt
  8. Turn the engine 2 rotations clockwise
  9. Tighten the tensioner
  10. The tension is set if the tension gauge indicates a deflection of:
  11. Check the timing marks again
    The specified rotation and the following timing-mark check form a verification step. Do not treat rotation alone as confirmation that the timing is correct. Recheck the marks at this point in the sequence before continuing with the subsequent refitting steps.

📐 3 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 3 workshop diagrams for this job Ask about your Nissan CD20T — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.