TorqFix

Turbocharger removal: Mercedes-Benz OM668 in W414

Turbocharger removal — Mercedes-Benz OM668 in W414. 116 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

116 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: fuel
  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Replacement notes from the steps (read the conditions below): Always use new gaskets

Don't miss

  • Do not drop any timing chain pins into the crankcase

🔧 Engine codes recorded for this source

📋 Procedure

Preparation and removal

  1. Always use new gaskets
  2. Timing chain separating tool:
  3. Disconnect the battery
  4. Timing chain assembly links:
  5. Timing chain assembly tools:
  6. Remove the mixing chamber housing with EGR valve
  7. Note: Avoid bending, torsion or traction
  8. Timing chain separating tool:
  9. Extractor:
  10. Disconnect the pressure sensor hose and plug
  11. Remove the oil filler tube
  12. Remove the heat shield(s)
  13. Remove the air inlet plenum
  14. Remove the catalytic converter heat shield(s)
  15. Remove the cooling fan shroud
  16. Disconnect the front exhaust hose from the catalytic converter
  17. Turbocharger:
  18. Disconnect the exhaust clamp
  19. Remove the catalytic converter
  20. Remove the air inlet hose from the turbocharger
  21. Remove the engine lower covers
  22. Remove the noise insulation cover
  23. Disconnect the oil feed and the oil return lines from the turbocharger
  24. Remove the turbocharger heat shield
  25. Disconnect the vacuum hose from the turbocharger actuator
  26. Remove the turbocharger
  27. Disconnect the fuel injector wiring
  28. Disconnect the fuel lines from the injectors
  29. Remove the injection lines
  30. Remove the fuel return line
  31. Remove the fuel injector clamps
  32. Remove the EGR pipe
  33. Remove the injectors
  34. If necessary
  35. Use the special tools
  36. Remove the fuel rail
  37. Disconnect the camshaft position sensor(s)
  38. Remove the turbocharger oil feed line
  39. Remove the glow plug wiring duct
  40. Remove the turbocharger bracket
  41. Remove the high-pressure line(s)
  42. Remove the cylinder head cover
  43. Disconnect the vacuum hose from the vacuum pump
  44. Remove the vacuum pump
  45. Remove the cylinder head front cover
  46. Turn the crankshaft to TDC for cylinder 1
  47. Fit the timing chain holding tool
  48. Note: Remove the cable tie before turning the engine
  49. Secure the chain against the camshaft gearwheel
  50. Note: Use a cable tie
  51. Turn the engine until the chain connecting link shows
  52. Secure the chain against the camshaft gearwheel
  53. Note: Use a cable tie
  54. Disconnect the chain
  55. Remove the assembly link
  56. Remove the camshaft gearwheel
  57. Separate the timing chain
  58. Note: Cover the timing chain housing with a clean cloth
  59. Remove the camshaft cover
  60. Note: Do not drop any timing chain pins into the crankcase
  61. Remove the camshafts

Installation and checks

  1. Connect the ends of the new chain
  2. Remove the timing chain holding tool
  3. Tighten the special tool
  4. Refit the camshaft gearwheel
  5. The timing is correct if:
  6. Pull the removed timing chain pins out of the chain separating tool
  7. Refit the camshaft gearwheel
  8. Fit the camshafts
  9. Chain tensioner:
  10. Refit the cylinder head front cover
  11. Vacuum pump:
  12. Refit the vacuum pump
  13. Reconnect the vacuum hose to the vacuum pump
  14. Cylinder head cover
  15. Refit the cylinder head cover
  16. Refit the high-pressure line(s)
  17. Refit the EGR pipe
  18. Turbocharger bracket bolts
  19. Refit the turbocharger bracket
  20. Refit the glow plug wiring duct
  21. Fit the oil feed line to the turbocharger
  22. Reconnect the camshaft position sensor(s)
  23. Fuel rail:
  24. Refit the fuel rail
  25. Refit the injectors
  26. Refit the fuel injector clamps
  27. Stage 1:
  28. Stage 2:
  29. Stage 3:
  30. Refit the injection lines
  31. Union nut:
  32. Reconnect the fuel lines to the injectors
  33. Reconnect the fuel injector wiring
  34. Refit the turbocharger
  35. Reconnect the vacuum hose to the turbocharger actuator
  36. Refit the turbocharger heat shield
  37. Reconnect the oil feed and oil return lines to the turbocharger
  38. Refit the noise insulation cover
  39. Refit the air inlet hose to the turbocharger
  40. Refit the engine lower covers
  41. Exhaust:
  42. Refit the catalytic converter
  43. Reconnect the exhaust clamp
  44. Reconnect the exhaust pipe to the catalytic converter
  45. Refit the cooling fan shroud
  46. Refit the catalytic converter heat shield(s)
  47. Refit the air inlet plenum
  48. Refit the heat shield(s)
  49. Refit the oil filler tube
  50. Reconnect the inlet manifold vacuum hose
  51. Refit the oil separator
  52. Refit the fuel filter housing
  53. Refit the mixing chamber housing with EGR valve
  54. Refit the air inlet hose
  55. Reconnect the battery

📐 29 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.