TorqFix

Injector removal & installation: Mercedes-Benz OM651 in W204, X204, W207, W212

Injector removal & installation — Mercedes-Benz OM651 in W204, X204, W207, W212. 67 source steps. Check the document conditions against your vehicle.

67 steps 6 engine codes

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: fuel
  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools

🔧 Engine codes recorded for this source

📋 Procedure

Preparation and removal

  1. Unless otherwise advised by the manufacturer, the following procedures are recommended:
  2. Use a timing chain assembly link
  3. Remove the air inlet duct
  4. Heat shield(s):
  5. Disconnect the mass airflow meter wiring
  6. Remove the assembly link
  7. Disconnect the air inlet hose
  8. Disconnect the engine control unit
  9. Disconnect the engine wiring loom
  10. Remove the air filter housing
  11. Disconnect the fuel lines from the injectors
  12. Remove the injection lines
  13. Disconnect the fuel injector wiring
  14. Remove the fuel injector clamps
  15. Remove the injectors
  16. Plug the holes
  17. Store in order
  18. Disconnect the positive crankcase ventilation hose
  19. Disconnect the camshaft position sensor electrical connector
  20. Disconnect the connectors
  21. Remove the engine wiring loom
  22. Move aside
  23. Disconnect the fuel return line
  24. Remove the cylinder head cover
  25. Remove the heat shield(s)
  26. Remove the chain tensioner piston
  27. Separate the timing chain
  28. Note: Cover the timing chain housing with a clean cloth

Installation and checks

  1. Connect the ends of the new chain
  2. Fit the timing chain holding tool
  3. Tighten the special tool
  4. Refit the chain tensioner piston
  5. Refit the heat shield(s)
  6. Turn the crankshaft to TDC for cylinder 1
  7. Check the position
  8. If the marks are misaligned
  9. Remove the camshafts
  10. Remove the special tools
  11. Pull the removed timing chain pins out of the chain separating tool
  12. Reconnect the fuel return line
  13. Refit the engine wiring loom
  14. Reconnect the connectors
  15. Reconnect the camshaft position sensor electrical connector
  16. Reconnect the positive crankcase ventilation hose
  17. Refit the injectors
  18. Refit the fuel injector clamps
  19. Stage 1:
  20. Stage 2:
  21. Stage 3:
  22. Reconnect the fuel injector wiring
  23. Refit the injection lines
  24. Reconnect the fuel lines to the injectors
  25. Stage 1:
  26. Stage 2:
  27. Injector
  28. Stage 1:
  29. Reconnect the engine wiring loom
  30. Stage 3:
  31. Union nut:
  32. Stage 1:
  33. Reconnect the mass airflow meter wiring
  34. Refit the air inlet duct
  35. Reconnect the battery earth cable
  36. Check for any fault codes
  37. Run the engine
  38. Check for leaks
  39. Refit the engine upper cover

📐 20 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.