TorqFix

OM642 in W463 — MERCEDES-BENZ

OM642 in W463 — Mercedes-Benz. 120 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

120 steps 2 engine codes

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: fuel
  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Special tools named: locking tool

Don't miss

  • If the timing chain is to be re-used, mark the running direction before removal
  • Do not drop any timing chain pins into the crankcase

🔧 Engine codes recorded for this source

642.886642.970

📋 Procedure

Preparation and removal

  1. If the timing chain is to be re-used, mark the running direction before removal
  2. Disconnect the battery earth cable
  3. Remove the engine upper cover
  4. Note: Avoid bending, torsion or traction
  5. Right-hand bank:
  6. Disconnect the mass airflow meter wiring
  7. Disconnect the positive crankcase ventilation hose
  8. Left-hand bank:
  9. Disconnect the mass airflow meter wiring
  10. Disconnect the air filter hose
  11. Centre:
  12. Disconnect the heater unit wiring
  13. Remove the air inlet hose from the turbocharger
  14. Remove the upper air duct
  15. Remove the pressure line between the turbocharger and the intercooler
  16. Right-hand bank:
  17. Remove the noise insulation cover
  18. Disconnect the fuel lines from the injectors
  19. Disconnect the fuel injector wiring
  20. Remove the fuel injector clamps
  21. Remove the injectors
  22. Store in order
  23. Disconnect the fuel lines from the fuel rail
  24. Disconnect the fuel rail pressure sensor
  25. Remove the high-pressure line(s)
  26. Remove the fuel rail
  27. Plug the holes
  28. Remove the cover
  29. Disconnect the vacuum pump hose
  30. Remove the vacuum pump
  31. Remove the oil separator
  32. Disconnect the camshaft position sensor(s)
  33. Loosen the bolts in a criss-cross pattern, starting from the outside
  34. Remove the bolts
  35. Remove the cylinder head cover
  36. Fit the camshaft locking tool
  37. Camshaft gearwheel locking tool:
  38. Remove the camshaft gearwheel bolt
  39. Turn the crankshaft to TDC for cylinder 1
  40. Check the position
  41. Secure the chain against the camshaft gearwheel
  42. Note: Use a cable tie
  43. Remove the chain tensioner piston
  44. Fit the camshaft gearwheel locking tool
  45. Remove the camshaft locking tool
  46. Timing chain assembly links:
  47. Use a timing chain assembly link
  48. Turn the engine until the chain connecting link shows
  49. Note: Remove the cable tie before turning the engine
  50. Disconnect the chain
  51. Remove the assembly link
  52. Remove the camshaft gearwheel locking tool
  53. Remove the camshaft locking tool
  54. Secure the chain against the camshaft gearwheel
  55. Note: Use a cable tie
  56. Remove the inlet camshaft

Installation and checks

  1. Connect the ends of the new chain
  2. Fit the timing chain holding tool
  3. Tighten the special tool
  4. Timing chain separating tools:
  5. Timing chain separating tools:
  6. Use the special tools to remove the timing chain pins
  7. Note: Do not drop any timing chain pins into the crankcase
  8. Remove the special tools
  9. Refit the inlet camshaft
  10. Fit the camshaft locking tool
  11. Stage 1:
  12. Tighten the camshaft gearwheel bolts
  13. Stage 2:
  14. Refit the chain tensioner piston
  15. Stage 3:
  16. Turn the engine by hand
  17. Note: Remove the cable tie before turning the engine
  18. Check the timing
  19. Remove the camshaft locking tool
  20. Refit the cylinder head cover
  21. Stage 1:
  22. Refit the bolts
  23. Stage 2:
  24. Tighten the bolts in a criss-cross pattern, starting from the centre
  25. Reconnect the camshaft position sensor(s)
  26. Refit the oil separator
  27. Vacuum pump:
  28. Refit the vacuum pump
  29. Refit the vacuum pump hose
  30. Refit the cover
  31. Fuel rail:
  32. Refit the fuel rail
  33. Stage 1:
  34. Refit the high-pressure line(s)
  35. Reconnect the fuel rail pressure sensor
  36. Reconnect the fuel lines to the fuel rail
  37. Injector
  38. Refit the injectors
  39. Stage 1:
  40. Refit the fuel injector clamps
  41. Stage 2:
  42. Reconnect the fuel injector wiring
  43. Stage 3:
  44. Reconnect the fuel lines to the injectors
  45. Refit the noise insulation cover
  46. Centre:
  47. Refit the pressure line between the turbocharger and the intercooler
  48. Check for correct fitting
  49. Refit the upper air duct
  50. Refit the air inlet hose to the turbocharger
  51. Reconnect the heater unit wiring
  52. Left-hand bank:
  53. Refit the air filter hose
  54. Reconnect the mass airflow meter wiring
  55. Right-hand bank:
  56. Reconnect the positive crankcase ventilation hose
  57. Reconnect the mass airflow meter wiring
  58. Refit the air filter housing
  59. General:
  60. Reconnect the battery earth cable
  61. Check for any fault codes
  62. Run the engine
  63. Check for leaks
  64. Refit the engine upper cover

📐 25 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.