TorqFix

Timing chain replacement: Mercedes-Benz OM642 in W219

Timing chain replacement — Mercedes-Benz OM642 in W219. 115 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

115 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Opens: fuel
  • Timing references: follow the source instructions for shaft position, timing marks and any locking tools
  • Special tools named: locking tool
  • Replacement notes from the steps (read the conditions below): Always renew the timing chain

Don't miss

  • Always renew the timing chain
  • If the timing chain is to be re-used, mark the running direction before removal
  • Do not drop any timing chain pins into the crankcase

🔧 Engine codes recorded for this source

📋 Procedure

Preparation and removal

  1. Unless otherwise advised by the manufacturer, the following procedures are recommended:
  2. Always renew the timing chain
  3. If the timing chain is to be re-used, mark the running direction before removal
  4. Right-hand bank:
  5. Remove the air filter housing
  6. Camshaft locking pins:
  7. Locking tool:
  8. Disconnect the positive crankcase ventilation hose
  9. Camshaft gearwheel locking tool:
  10. Timing chain separating tools:
  11. Timing chain assembly links:
  12. Left-hand bank:
  13. Timing chain assembly tools:
  14. Disconnect the air filter hose
  15. Timing chain separating tools:
  16. Centre:
  17. Disconnect the heater unit wiring
  18. Remove the air inlet hose from the turbocharger
  19. Remove the upper air duct
  20. Remove the pressure line between the turbocharger and the intercooler
  21. Right-hand bank:
  22. Remove the noise insulation cover
  23. Disconnect the fuel lines from the injectors
  24. Disconnect the fuel injector wiring
  25. Remove the fuel injector clamps
  26. Remove the injectors
  27. Store in order
  28. Disconnect the fuel lines from the fuel rail
  29. Disconnect the fuel rail pressure sensor
  30. Remove the high-pressure line(s)
  31. Remove the fuel rail
  32. Plug the holes
  33. Remove the oil separator
  34. Disconnect the camshaft position sensor(s)
  35. Loosen the bolts in a criss-cross pattern, starting from the outside
  36. Remove the bolts
  37. Remove the cylinder head cover
  38. Fit the camshaft locking tool
  39. Remove the camshaft gearwheel bolt
  40. Turn the crankshaft to TDC for cylinder 1
  41. Check the position
  42. Fit the camshaft locking tool
  43. Refit the inlet camshaft gearwheel
  44. Note: Keep one bolt to secure
  45. Fit the camshaft gearwheel locking tool
  46. Connect the old chain to the new one
  47. Use a timing chain assembly link
  48. Turn the engine until the chain connecting link shows
  49. Note: Cover the timing chain housing with a clean cloth
  50. Disconnect the chain
  51. Remove the assembly link
  52. Remove the camshaft gearwheel locking tool
  53. Remove the camshaft locking tool
  54. Secure the chain against the camshaft gearwheel
  55. Note: Use a cable tie
  56. Remove the inlet camshaft

Installation and checks

  1. Connect the ends of the new chain
  2. Fit the timing chain holding tool
  3. Tighten the special tool
  4. Use the special tools to remove the timing chain pins
  5. Note: Do not drop any timing chain pins into the crankcase
  6. Cylinder head cover
  7. Pull the removed timing chain pins out of the chain separating tool
  8. Stage 2:
  9. Stage 3:
  10. Fuel rail:
  11. Union nut:
  12. Check the position
  13. Fit the camshaft locking tool
  14. Tighten the camshaft gearwheel bolts
  15. Refit the chain tensioner piston
  16. Turn the engine by hand
  17. Note: Remove the cable tie before turning the engine
  18. Check the timing
  19. Use the special tools
  20. Remove the camshaft locking tool
  21. Refit the cylinder head cover
  22. Refit the bolts
  23. Tighten the bolts in a criss-cross pattern, starting from the centre
  24. Stage 1:
  25. Stage 2:
  26. Stage 2:
  27. Stage 3:
  28. Refit the oil separator
  29. Refit the fuel rail
  30. Refit the high-pressure line(s)
  31. Reconnect the fuel rail pressure sensor
  32. Reconnect the fuel lines to the fuel rail
  33. Refit the injectors
  34. Refit the fuel injector clamps
  35. Stage 1:
  36. Stage 2:
  37. Stage 3:
  38. Reconnect the fuel injector wiring
  39. Reconnect the fuel lines to the injectors
  40. Refit the noise insulation cover
  41. Centre:
  42. Refit the pressure line between the turbocharger and the intercooler
  43. Check for correct fitting
  44. Refit the upper air duct
  45. Refit the air inlet hose to the turbocharger
  46. Reconnect the heater unit wiring
  47. Left-hand bank:
  48. Refit the air filter hose
  49. Reconnect the mass airflow meter wiring
  50. Right-hand bank:
  51. Reconnect the positive crankcase ventilation hose
  52. Reconnect the mass airflow meter wiring
  53. Refit the air filter housing
  54. General:
  55. Reconnect the battery earth cable
  56. Check for any fault codes
  57. Run the engine
  58. Check for leaks
  59. Refit the engine upper cover

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.