Timing chain replacement: Fiat Punto 1.3 JTD - Chain replacement
Timing chain replacement — Fiat Punto 1.3 JTD - Chain replacement. 127 source steps. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
- Opens: coolant, engine oil, refrigerant (A/C)
- Timing references: follow the source instructions for shaft position, timing marks and any locking tools
- Special tools named: locking tool, locking pin
- Replacement notes from the steps (read the conditions below): Always replace the timing chain Always use new gaskets Renew the crankshaft oil seal
Don't miss
- Always replace the timing chain
- If the timing chain is to be re-used, mark the running direction before removal
- Never turn the engine in the direction opposite to that of normal operation
- Before disconnecting the battery cable, ensure that the ignition key is in the OFF position
- Mark the running direction of the ancillary drive belt with chalk
🔧 Engine codes recorded for this source
📋 Procedure
Special tools
- Sealant
- Oil seal installer
- Camshaft locking tool
- Counter-hold tool
- Engine support tool
- Flywheel locking tool
- Diameter is (x)
Warnings and recommendations
- Unless otherwise advised by the manufacturer, the following procedures are recommended:
- Always replace the timing chain
- If the timing chain is to be re-used, mark the running direction before removal
- Never turn the engine in the direction opposite to that of normal operation
- Note: Avoid bending, torsion or traction
General
- Before disconnecting the battery cable, check the audio system security code
- Special tools are required
- If the timing chain is to be re-used, mark the running direction before removal
- Always use new gaskets
Removal
- Disconnect the battery earth cable
- Before disconnecting the battery cable, ensure that the ignition key is in the OFF position
- Drain the air conditioning system
- Special tools are required
- Remove the engine lower cover
- Remove the right front wheel
- Remove the right front splash guard
- Mark the running direction of the ancillary drive belt with chalk
- Remove the ancillary drive belt
- Fit the flywheel locking tool
- Diameter is (x)
- Remove the crankshaft pulley
- Remove the flywheel locking tool
- Raise the vehicle
- Remove the front exhaust pipe
- Remove the reinforcement brace
- Drain the engine oil
- Remove the oil sump
- Use a special tool to cut the sealant
- Clean off the old sealant
- Lower the vehicle
- Disconnect the mass airflow meter wiring
- Disconnect the air-inlet hose
- Remove the air filter together with the mass airflow meter
- Disconnect the lower radiator hose
- Drain the cooling system
- Remove the access plug
- Fit the exhaust camshaft locking tool
- The special tool must be in a horizontal position
- Fit the flywheel locking tool
- Disconnect the air-conditioning line(s)
- Plug the hose(s)
- Remove the coolant expansion tank and place to one side
- Use a trolley jack to support the engine
- Disconnect the air-conditioning line(s)
- Remove the engine mounting
The engine-support operation comes before removal of the mounting in this sequence. Treat it as a prerequisite to that removal. This short instruction establishes the order, but does not by itself describe lifting points or a complete support setup. - Remove the bolts
- Remove the engine support bracket
- Use a hoist to support the engine
- Note: Connect to the lifting eye
- Remove the trolley jack
- Remove the crankshaft pulley support flange
- Use the special tool to counterhold
- Note: Left hand thread
- Remove the ancillary drive belt tensioner
- Remove the coolant pump
- Unclip the wiring loom
- Disconnect the oil breather pipe
- Remove the timing cover bolts
- Remove the bracket
- Remove the timing chain cover
- Remove the gasket(s)
- Remove the engine oil pick-up pipe
- Remove the crankshaft front radial seal
- Remove the camshaft gearwheel bolt
- Lock the chain tensioner with a locking pin
- Remove the timing chain and gearwheels together
Installation
- Fit the timing chain and gearwheels together
- Tighten the camshaft gearwheel bolt
- Remove the locking pin from the chain tensioner
- Check that the tensioner piston is in contact with the plate
- Renew the crankshaft oil seal
- Use a special tool:
- Refit the engine oil pick-up pipe
- Renew the gasket
- Fit the timing cover gasket
- Fit the special tool to the timing cover
- Refit the timing chain cover
- Temporarily secure the front cover using the crankshaft pulley bolt
- Tighten the timing cover bolt(s)
- Remove the special tool
- Refit the bracket
- Refit the wiring loom
- Refit the oil breather pipe
- Tighten the bolts
- Check that the O-ring is not distorted or displaced
- Refit the oil sump
- Apply sealant as indicated
- Note: The sealant bead must be unbroken
- Diameter is (x)
- Refit the drain plug
- Refit the reinforcement brace
- Refit the front exhaust pipe
- Fit the coolant pump
- Renew the gasket
- Refit the ancillary drive belt tensioner
- Refit the crankshaft pulley support flange
- Note: Left hand thread
- Use the special tool to counterhold
- Refit the crankshaft pulley
- Note: Use a wrench to hold the crankshaft pulley centre bolt
- Refit the ancillary drive belt
- Note: Check that the direction of travel is as marked
- Refit the right front splash guard
- Refit the right front wheel
- Refit the engine lower cover
- Lower the vehicle
- Place the jack under the engine sump
- Remove the engine support tool
- Refit the engine support bracket
- Refit the engine mounting
- Engine mount to engine support:
- Engine mount to body:
- Re-fasten the air-conditioning lines
- Remove the trolley jack
- Renew the seals
- Reconnect the coolant hoses
- Refit the coolant expansion tank
- Reconnect the air-conditioning line(s)
- Renew the seals
- Remove all the locking tools
- Refit the access plugs
- Refit the air filter housing and hoses
- Reconnect the mass airflow meter wiring
- Refill the engine oil
- Refill the cooling system
- Refill the air-conditioning system
- Reconnect the battery earth cable
Other FIAT procedures
- Cylinder head removal Punto 99- 1900 JTD
- Fiat Doblo 1.3 JTD 1.2 Multijet timing chain replacement
- Fiat Panda 1.3 JTD 1.2 JTD timing chain replacement
- 500 my07 1.3 16V chain
- Fiat 500L 1.3 Multijet 199B4000 timing chain replacement
- Cylinder head removal Punto 03-> 100 CV
- Ypsilon/Musa 1.3 JTD - Chain replacement
- Doblo 2000 - 2010 1.3 JTD C510 gearbox
- Punto 1372 turbo MOTOR U+I no pic + Nm
- Croma 2.2 Petrol Cylinder Head Removal
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.