TorqFix

Removing and installing oil supply line, bi-turbo: VW (CKUB, CKUC, CSNA)

Removing and installing oil supply line, bi-turbo — VW (CKUB, CKUC, CSNA). 22 source steps. Check the document conditions against your vehicle.

22 steps 3 engine codes Showing one source document; this title group contains 2 variants

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

  • Special tools named: T50015
  • Replacement notes from the steps (read the conditions below): Renew seals, gaskets and self-locking nuts. Fit new double seal (2) onto the respective line connection (1) and secure by screwing in the corresponding banjo bolt (3).

Don't miss

  • Seal opening in turbocharger with clean cloths or similar.

🔧 Engine codes recorded for this source

This source is from the Volkswagen commercial-vehicle documentation. The previous catalogue make label was incorrect; confirm the source vehicle and engine before use.

📋 Procedure

  1. Loosen clip (A) from intake hose (1).
  2. Detach intake hose (1) from air mass meter G70.
  3. Unclip vacuum lines(B) from retainer.
  4. Pull crankcase breather hose (1) off.
  5. Loosen clip (A) and remove intake hose.
  6. Undo and remove banjo bolt (arrow) from top oil supply line.
  7. Undo and remove banjo bolt (arrow) from bottom oil supply line.
  8. Loosen clip (2) for connecting hose (1) and detach connecting hose from pulsation damper. [Note: Seal opening in turbocharger with clean cloths or similar.]
  1. Unbolt bracket (2) for oil supply line (1) from turbocharger.
  2. Locate engine support T50015 as shown and brace engine.
  3. Undo and remove bolt (arrow) from engine mount on right (1).
  4. Undo and remove bolt (arrow) from engine mount on right (1) and remove engine mount.
  5. Remove starter Electrical system 27. Removing and installing starter.
  6. Unscrew banjo bolt (2) for oil supply line (1).
  7. Collect escaping oil with a cloth.
  8. Completely remove oil supply line.
  1. Renew seals, gaskets and self-locking nuts.
  2. Fit new double seal (2) onto the respective line connection (1) and secure by screwing in the corresponding banjo bolt (3).
  3. Install starter Electrical system 27. Removing and installing starter.
  4. Install right engine support (see the separate procedure).
  5. Install intake hose.
  1. Check oil level (see the separate procedure).

📐 11 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 11 workshop diagrams for this job Ask about your VW CKUB — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.