Removing and installing gearbox mounting: vehicles with 4-cylinder engine — Audi TT Mk1 (8N)
Removing and installing gearbox mounting — vehicles with 4-cylinder engine — Audi TT Mk1 (8N). Read available instructions and vehicle application notes.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
🧭 Before you start
Models recorded for this source: Audi TT Mk1 (8N)
Don't miss
- (Item 1) can be disregarded.
📋 Procedure
- Remove cover panel (front left) (arrows).
- ⚠ Follow steps required when disconnecting battery Electrical system27. — With ignition switched off, disconnect earth wire at battery.
- Detach air intake hose at throttle valve module J338 (slacken hose clip (4)).
- Unplug electrical connector for air mass meter G70(1).
- If fitted, detach hose (5) from air cleaner housing.
- Remove bolts (2) and (3).
- Take out air cleaner housing.
- Remove battery and battery tray (arrows).
- Set up support bracket10-222 A with rack10-222 A/1 on wing mounting flanges (arrows).
- Take up weight of engine/gearbox assembly via the spindle.
- Remove bolts (2). [Note: (Item 1) can be disregarded.]
- Remove all components to obtain access to bolts (1) and (2).
- Remove bolts (1) and (2).
- Take off gearbox mounting (A).
- Install gearbox mounting (A) with new bolts.
- Pull gearbox up to gearbox support with spindle on support bracket.
- ⚠ Before tightening the bolts (arrows), the gearbox support (1) and the support arm (2) of the gearbox mounting must be aligned absolutely parallel, otherwise the threads will be damaged. If necessary, push gearbox up at the rear with trolley jack. — Secure support arm (2) of gearbox mounting to gearbox support (1) using the bolts (arrows).
- ⚠ Support bracket10-222 A must not be removed until all bolts on left and right assembly mountings have been tightened to specified torque. — Install battery tray and battery; follow steps required after connecting battery Electrical system27.
- Install air cleaner housing.
📐 6 workshop diagrams for this procedure
Drawings linked to this procedure in the workshop data. Locked in the free view.
Other AUDI procedures
- Removing and installing gearbox mounting - vehicles with 6-cylinder engine
- 10-cylinder direct petrol injection engine (5.0 ltr. 4-valve turbo RS 6), mechanics — Separating engine and gearbox
- 10-cylinder direct petrol injection engine (5.0 ltr. 4-valve turbo RS 6), mechanics — Securing engine to engine and gearbox support
- 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve), mechanics — Securing engine to engine and gearbox support
- 10-cylinder direct petrol injection engine (5.2 ltr. 4-valve), mechanics — Separating engine and gearbox
- 12-cylinder TDI engine (6.0 ltr. 4-valve common rail), mechanics — Securing engine to engine and gearbox support
- Removing and installing toothed belt – Audi
- Removing engine – Audi A8 D3
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7
- Installing engine – Audi A8 D4
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.