TorqFix

Removing and installing front exhaust pipe (right-side) — AUDI

Removing and installing front exhaust pipe (right-side) on Audi: 10 steps, engines BCY, BRV. What to remove, in what order, and what to check after.

Workshop procedure for AUDI — the exact step sequence and torque figures, straight from real workshop data.

10 steps 2 engine codes

🧭 Before you start

Fits: Audi A6 C5 (4B)

  • Renewed: gaskets

Don't miss

  • All cable ties which are released or cut open when removing must be refitted in the same position when installing.
  • The engine/gearbox assembly must be secured well to prevent accidents. — Unplug electrical connectors for lambda probes (right-side) before and after catalytic converter.
  • Reinstall all cable ties in the same locations when assembling.Renew gaskets and self-locking nuts.
  • If dimension "“a”" cannot be attained, the turbocharger must be aligned .

🔧 Engine codes this applies to

📐 4 workshop diagrams for BCY

Real factory drawings for this job — timing marks, bolt locations and routing. Locked in the free view.

Removing and installing front exhaust pipe (right-side) — BCY · diagram 1
Removing and installing front exhaust pipe (right-side) — BCY · diagram 2
Removing and installing front exhaust pipe (right-side) — BCY · diagram 3
Removing and installing front exhaust pipe (right-side) — BCY · diagram 4

📋 Procedure

  1. Remove engine . [Note: All cable ties which are released or cut open when removing must be refitted in the same position when installing.]
  2. Place the engine/gearbox assembly onto workbench or trolley (place wooden wedges under the engine and gearbox to secure them).
  3. ⚠ The engine/gearbox assembly must be secured well to prevent accidents. — Unplug electrical connectors for lambda probes (right-side) before and after catalytic converter.
  4. Move wiring clear.
  5. Unbolt front exhaust pipe (right-side) from turbocharger (arrows). [Note: Reinstall all cable ties in the same locations when assembling.Renew gaskets and self-locking nuts.]
BCY? Steps differ between engine variants — check this job against your exact car before you commit to it. Check my car — free →
  1. Initially tighten front exhaust pipe onto turbocharger only hand-tight.
  2. Check distance between front exhaust pipe and gearbox housing at position indicated.
  3. Move the front exhaust pipe in its bolt holes as necessary.
  4. Tighten connections to final torque. [Note: If dimension "“a”" cannot be attained, the turbocharger must be aligned .]
  5. Install engine .
Workshop diagrams

Ask TorqFix about your Audi BCY — it answers with the exact sequence for that engine and the workshop drawing for each step. First question is free after a 20-second sign-up, no card.

Ask about your Audi BCY — free → or sign up free to see the drawings

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

The figures on this page come from manufacturer workshop documentation and are shown as they are. The page is assembled automatically from that data — it is not written by an AI. The AI works in the chat, where it answers for your specific car. It writes nothing here.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix →

Workshop data on this page last updated 20 Sep 2026.