Exploded view: centre differential housing — bolted propshaft — Audi
Exploded view — centre differential housing — bolted propshaft — Audi. Original source text. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
📋 Procedure
Exploded view - centre differential housing - bolted propshaft
The centre differential housing can also be removed and installed with the gearbox installed in the vehicle (see the separate procedure).
Note (see “General repair instructions”). (see “Rules for cleanliness”).
Repair work and tightening torques are described in Workshop Manual
“Servicing 7-speed dual clutch gearbox 0B5 (S tronic)”.
Bolt
Aluminium bolts (11x)
Tightening torque and sequence (repair group 39: Centre differential; Exploded view - centre differential)
Housing
For centre differential (see “Removing and installing centre differential housing - bolted propshaft”)
Ball bearing
For flange shaft (rear)
Removing and installing (repair group 39: Centre differential; Exploded view - centre differential)
Spacer sleeve
Pressing out and in (repair group 39: Centre differential; Exploded view - centre differential)
Bearing plate
Installation position: shoulder must engage in recess in gearbox housing
Spacer sleeve
Shim
Ball bearing
For centre differential
Centre differential
Ball bearing
For centre differential
Spring
Shim
Dished spring
Installation position: convex side (which curves outwards) faces oil seal item 17
Circlip
For flange shaft (rear)
Removing and installing (repair group 39: Centre differential; Exploded view - centre differential)
Bolt
Steel bolts (2x)
Tightening torque and sequence (repair group 39: Centre differential; Exploded view - centre differential)
Damper weight
Depending on version
Oil seal
Renewing (repair group 39: Centre differential; Exploded view - centre differential)
Flange shaft (rear)
Without vibration damper
For correct version, refer to
Electronic parts catalogue
Removing and installing (repair group 39: Centre differential; Exploded view - centre differential)
Flange shaft (rear)
With vibration damper
For correct version, refer to
Electronic parts catalogue
Removing and installing (repair group 39: Centre differential; Exploded view - centre differential)
Bolt
Tightening torque (repair group 39: Centre differential; Exploded view - centre differential)
TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.
Ask about my car →Other AUDI procedures
- Exploded view - centre differential housing
- Exploded view - centre differential housing (propshaft with splines)
- Exploded view - centre differential housing - propshaft with splines on gearbox end
- Exploded view - centre differential housing with rear splined shaft (propshaft with splines on gearbox end)
- Exploded view - dismantling and assembling centre differential housing
- Automatic gearbox 09E, four-wheel drive — Exploded view - centre differential
- Removing and installing toothed belt – Audi
- Removing engine – Audi A8 D3
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7
- Installing engine – Audi A8 D4
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.