TorqFix

Dismantling and assembling drive shaft, triple roller joint AAR 2000/108: Audi A1 (8X)

Dismantling and assembling drive shaft, triple roller joint AAR 2000/108 — Audi A1 (8X). 36 source steps. Check the document conditions against your vehicle.

36 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A1 (8X, 2010–2018)

  • Special tools named: puller, torque wrench

Don't miss

  • Deflector ring (1) must be flush with contact surface of outer joint (arrow).
  • Apply clamp tensionerV.A.G 1682 A as shown. Ensure jaws of tool make contact with lugs (arrows B) on hose clip.
  • Mark installation position of parts (1…3) with lines.
  • Install circlip (ensure proper seating).
  • Attach new cover to joint body: tabs must be positioned on straight surfaces of joint body (arrow).

📋 Procedure

  1. Clamp drive shaft in vice using protective jaw covers.
  2. Fold back rubber boot.
  3. Set up puller T10382 so that smooth side of puller plate T10382/1 faces towards spindles T10382/2.
  4. Assemble puller T10382 together with multi-purpose toolVW 771.
  5. Pull CV joint off drive shaft using puller T10382 and multi-purpose toolVW 771.
  1. Knock onto shaft with plastic hammer until circlip engages. [Note: Deflector ring (1) must be flush with contact surface of outer joint (arrow).]
  1. Insert lug (1) of hose clip into guide (arrow).
  2. Compress hose clip with pliers, e.g. locking pliers for Phaeton steering rack VAS 6199 until upper part (arrow 1) locks with guide (2).
  1. Apply clamp tensioner V.A.G 1682 A as shown. Ensure jaws of tool make contact with lugs (arrows B) on hose clip.
  2. Tighten hose clip by turning spindle with torque wrench (take care to keep tool straight). [Note: Due to the hard material of the CV joint boot (as opposed to rubber), a stainless steel hose clip is required; this can only be tightened using clamp tensioner V.A.G 1682 A.Tightening torque: 25 Nm.Make sure thread of spindle (A) on clamp tensioner turns freely. Lubricate with MOS2 grease if necessary. If the thread is stiff (e.g. due to dirt), the required clamping force will not be attained at the hose clip when the specified tightening torque is applied.]
  1. Open hose clip on joint body and slide back boot.
  2. Open out metal tabs on cover using a flat-bladed screwdriver and lever off cover.
  3. Mark installation position of parts (1…3) with lines.
  1. Take seal (arrow) out of groove.
  2. Remove circlip (arrow).
  3. Hold joint body and take drive shaft out of vice.
  4. Insert drive shaft in press.
  5. Hold drive shaft, then press triple roller spider off drive shaft.
  6. Remove triple roller spider with rollers and place on a clean surface.
  7. Pull joint body off shaft.
  8. Pull boot off drive shaft.
  9. Clean shaft and joint body.
  1. Push boot for inner joint onto shaft.
  2. Push joint body onto shaft.
  1. Fit triple roller spider onto shaft according to markings and press on as far as stop.
  2. Install circlip (ensure proper seating).
  3. Slide joint body over rollers and hold in position.
  4. Press half the specified quantity of drive shaft grease from the repair kit into the triple roller joint.
  5. Press the other half of the specified quantity of drive shaft grease from the repair kit into the back of the triple roller joint.
  6. Install joint boot.
  1. Now take drive shaft out of vice and clamp joint body in position in vice.
  2. Insert new seal (arrow) from repair kit into groove.
  3. Attach new cover to joint body: tabs must be positioned on straight surfaces of joint body (arrow).
  1. Install hose clip. [Note: In order to insert the multi-point socket-head bolts when installing the drive shaft, the lug (arrow A) on the hose clip must be positioned between the mounting flanges (arrows B) on the joint body.]
  1. Apply clamp tensioner V.A.G 1682 A as shown. Ensure jaws of tool make contact with lugs (arrows B) on hose clip.
  2. Tighten hose clip by turning spindle (A) with torque wrench (take care to keep clamp tensioner straight). [Note: Due to the hard material of the CV joint boot (as opposed to rubber), a stainless steel hose clip is required; this can only be tightened using clamp tensioner V.A.G 1682 A.Tightening torque: 25 Nm.Make sure thread of spindle (A) on clamp tensioner turns freely. Lubricate with MOS2 grease if necessary. If the thread is stiff (e.g. due to dirt), the required clamping force will not be attained at the hose clip when the specified tightening torque is applied.]

🎬 Related video tutorial

Independent AUTODOC tutorial for the same job, filmed on a different model (A6 C5 Avant) — confirm applicability separately; fasteners, figures and the working sequence can differ.

How to change cv joint on AUDI A6 C5 Avant

How to change cv joint on AUDI A6 C5 Avant

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.