TorqFix

Dismantling and assembling drive shaft, inner constant velocity joint: Audi Q7 (4M)

Dismantling and assembling drive shaft, inner constant velocity joint — Audi Q7 (4M). 30 source steps. Check the document conditions against your vehicle.

30 steps

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi Q7 (4M, 2015–)

Don't miss

  • The alignment must be very accurate, because no further alignment is possible once the part has been hammered on.
  • Disregard item (1).

📋 Procedure

  1. Clamp drive shaft horizontally in vice using protective jaw covers.
  2. Drive off cover with a copper or brass drift (arrow).
  3. Drive off cap with a copper or brass drift (arrow).
  4. Unfasten and detach only the "“small”" hose clip.
  5. Remove circlip using circlip pliers.
  6. Set up special tools as shown in illustration.
  7. Press inner constant velocity joint off drive shaft.
  8. Pull boot off drive shaft.
  1. Push boot with "“small”" hose clip onto drive shaft.
  2. Grease splines (arrow A) on drive shaft lightly with grease used in joint before fitting joint body onto drive shaft.
  3. Set up special tools as shown in illustration.
  1. Press on joint as far as stop.
  2. Install new circlip using circlip pliers.
  3. Check that circlip is seated correctly.
  4. Before fitting boot, pack half the drive shaft grease provided into joint from boot side of joint.
  5. Lubricate contact surfaces for boot and cap.
  6. Apply sealantD 454 300 A2(hatched area) on clean inner surface of cap on boot.
  1. Route sealant bead around inside of holes (arrow).
  2. Align cap and bolts (arrows) with bolt holes. [Note: The alignment must be very accurate, because no further alignment is possible once the part has been hammered on.]
  1. Drive on cover using a plastic hammer.
  2. Remove surplus sealing compound immediately as it is pressed out.
  3. Pack remaining drive shaft grease into constant velocity joint through ball races.
  4. Degrease contact surface for cover and for constant velocity joint.
  5. Apply sealantD 454 300 A2(hatched area) to clean inner surface of cover.
  1. Route sealant bead around inside of holes (arrow).
  2. Using bolts (arrows), align new cover in relation to bolt holes. [Note: The alignment must be very accurate, because no further alignment is possible once the part has been hammered on.]
  1. Drive on cover using a plastic hammer.
  2. Remove surplus sealant immediately as it is pressed out.
  3. Slide boot onto drive shaft and position it in groove (2) between (arrows). [Note: Disregard item (1).]
  1. Tighten hose clips on inner joint (see the separate procedure).

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.