Checking charge pressure control solenoid valve -N75: Audi
Checking charge pressure control solenoid valve -N75 — Audi. Original source text. Check the document conditions against your vehicle.
Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.
📋 Procedure
Special tools and workshop equipment required
V.A.G 1526 A
V.A.G 1594 A
V.A.G 1598 with V.A.G 1598/5
VAS 5051 with VAS 5051/1 and VAS 5051/2
Test sequence
Note:
Charge pressure control solenoid valve -N75 and wiring are monitored by engine control unit.
Connect up vehicle diagnostic, testing and information system VAS 5051 and select vehicle system "01 - Engine electronics" from list. Ignition must be on.
=> Motronic Injection and Ignition System (5-cylinder); Repair Group 01
Motronic Injection and Ignition System (5-cylinder)
Read out fault memory of engine control unit.
=> Motronic Injection and Ignition System (5-cyl.); Repair Group 01; Interrogating and erasing fault memory
Motronic Injection and Ignition System (5-cyl.)
Interrogating and erasing fault memory
If fault relating to charge pressure control solenoid valve -N75 is displayed:
Detach hoses from charge pressure control solenoid valve -N75; leave connector attached.
Connect test hose to long valve connection.
Vehicle diagnostic, testing and information system VAS 5051 connected up; vehicle self-diagnosis and vehicle system "01 - Engine electronics" selected. Ignition must be on.
Indicated on VAS 5051:
From list -1- select diagnostic function "03 - Final control diagnosis".
Keep touching ▸ key until following display appears:
Indicated on VAS 5051:
A -
8th control element being tested
8 -
Charge pressure control solenoid valve -N75
Valve must click...
...and must open and close (can be checked by blowing into test hose).
Terminate function "03 - Final control diagnosis" by touching ◂ key.
If valve does not open or close properly:
Replace charge pressure control solenoid valve -N75.
If valve does not click:
Checking internal resistance
Switch off ignition.
Unplug connector -arrow- at charge pressure control solenoid valve.
Connect multimeter to valve for resistance measurement.
Specification: 25 ... 35 ω
If reading does not match specification:
Replace charge pressure control solenoid valve -N75.
If reading matches specification:
Checking power supply
Test requirements:
Fuse for charge pressure control solenoid valve OK
=> Current Flow Diagrams, Electrical Fault-finding and Fitting Locations binder
Fuel pump relay OK
=> Motronic Injection and Ignition System (5-cylinder); Repair Group 24
Motronic Injection and Ignition System (5-cylinder)
Connect up voltage tester V.A.G 1527 B as follows.
Connector / Contact · Measure to
1 · Engine earth
Briefly operate starter.
LED must light
If LED does not light:
Use current flow diagram to check for open circuit in wiring from contact 1 of connector via fuse to fuel pump relay.
If LED lights:
Checking actuation
Connect up voltage tester V.A.G 1527 B to contacts 1 (positive) and 2 of connector.
Vehicle diagnostic, testing and information system VAS 5051 connected up; vehicle self-diagnosis and vehicle system "01 - Engine electronics" selected. Ignition must be on.
Indicated on VAS 5051:
From list -1- select diagnostic function "03 - Final control diagnosis".
Keep touching ▸ key until following display appears:
Indicated on VAS 5051:
A -
8th control element being tested
8 -
Charge pressure control solenoid valve -N75
LED must flash
Terminate function "03 - Final control diagnosis" by touching ◂ key.
If LED does not flash or if it is permanently lit:
With ignition switched off, use adapter V.A.G 1598/5 to connect test box V.A.G 1598A to engine control unit connector only (not to control unit).
=> Motronic Injection and Ignition System (5-cylinder); Repair Group 24
Motronic Injection and Ignition System (5-cylinder)
Attention:
So as not to destroy electronic components, select required measuring range before connecting test leads and observe test conditions.
Check for open circuit and short to earth/positive in the following wiring.
Connector / Contact · Test box V.A.G 1598 A / Socket
2 · 33
Use current flow diagram to eliminate open circuit in wiring/short circuit.
If wiring is OK:
Replace engine control unit.
TorqFix answers live for your specific car — tell it the engine code to check the available procedures, torque figures and wiring for that variant.
Ask about my car →Other AUDI procedures
- Checking solenoid valve for charge pressure control N75
- Check solenoid valve for boost pressure limitation -N75
- Checking charge pressure control solenoid valves N75 and N274
- Checking solenoid valve for boost pressure control -N75
- Checking solenoid valve for boost pressure limitation -N75
- Checking solenoid valve for charge pressure control N75 – Audi
- Removing and installing toothed belt – Audi
- Removing engine – Audi A8 D3
- Removing camshaft timing chain from camshafts – Audi A6/A7 C7
- Installing engine – Audi A8 D4
Who makes these pages, and how
TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.
Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.
Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.
Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com
The story behind TorqFix → · How these pages are made →Workshop data on this page last updated 20 Sep 2026.