TorqFix

Radiator removal: Audi 1.6 ALZ A4

Radiator removal — Audi 1.6 ALZ A4. 52 source steps. Read the instructions and application notes; confirm the exact vehicle before use.

52 steps 1 engine code

Match the vehicle and component conditions in this source. Read warnings and variant notes with the steps they qualify; linked operations need their own instructions.

🧭 Before you start

Models recorded for this source: Audi A3 (8V, 2012–2020)

  • Opens: coolant

🔧 Engine codes recorded for this source

ALZ

📋 Procedure

Preparation and removal

  1. Remove the engine lower cover
  2. Use the special tools
  3. Type 1:
  4. Open the radiator drain plug
  5. Type 2:
  6. Remove the temperature sensor
  7. Remove the engine upper cover
  8. All vehicles:
  9. Place the expansion reservoir aside
  10. Disconnect the hose
  11. Drain the cooling system
  12. Remove the cowl top grille

Installation and checks

  1. Refit the hose
  2. Close the radiator drain plug
  3. Fill the reservoir
  4. Fit the special tool
  5. onto the coolant reservoir
  6. Fit the special tool
  7. Use a reservoir for coolant drawn by the compressed air
  8. Close the valves at B
  9. Connect to a compressed air source
  10. Pressure:
  11. Open the following valve(s):
  12. The needle on the gauge moves into the green zone
  13. A partial vacuum is created in the cooling system
  14. Open the following valve(s):
  15. Until coolant has reached the valve
  16. Close the following valve(s):
  17. Open the following valve(s):
  18. Wait for 2 minutes
  19. Close the following valve(s):
  20. The cooling system can be filled if the needle stops in the green zone
  21. Note: Repeat the procedure if the needle is outside the specified area
  22. Disconnect the compressed air source
  23. Open the following valve(s):
  24. Refill the cooling system
  25. Remove the special tool
  26. Fit the special tool
  27. onto the coolant reservoir
  28. Top up the coolant until it emerges from the bleed hole in the coolant hose
  29. Top up the coolant until it emerges from the bleed hole in the coolant hose
  30. Close the bleed screw
  31. Run the engine
  32. Set the temperature controls to maximum heat
  33. Run the engine at 2000 rpm
  34. Run the engine for 3 minutes
  35. Allow the engine to idle
  36. Until the radiator fan comes on or the engine coolant reaches 90 °C
  37. Run the engine at 2000 rpm
  38. Run the engine for 1 minute
  39. Turn the engine off
  40. Check the coolant level

📐 7 workshop diagrams for this procedure

Drawings linked to this procedure in the workshop data. Locked in the free view.

🔒 7 workshop diagrams for this job Ask about your Audi ALZ — free or create a free account

Who makes these pages, and how

TorqFix was built by a mechanic — after a 2,700 km drive with five roadside repairs that no diagnostic tool could explain.

Workshop figures are drawn from the available source documentation. Pages are assembled automatically, with source instructions and explanatory material presented together. Some explanations use AI assistance. Automated source checks are not a claim that a mechanic reviewed every page; read the source conditions and the editorial method below.

Variants of the same model differ. Cross-check torque against the factory manual for your engine before final tightening.

Seen a figure that does not match your manual? Write to us — we correct it and note when. support@torqfix.com

The story behind TorqFix → · How these pages are made →

Workshop data on this page last updated 20 Sep 2026.